Asset
Installed, tested, accepted and maintainable.
We connect project, asset, information, people and systems so operations are ready from day one.
Delays, early-life failures, incomplete information and supplier dependency often begin when readiness activities start too late.
Installed, tested, accepted and maintainable.
Roles, people, skills and shifts prepared.
Data, SAP PM/CMMS, documents and workflows available.
Procedures, materials, risks and routines controlled.
The program integrates with the project master schedule and uses gates to evidence the real state of readiness.
Operating model, readiness criteria, deliverables and governance.
Embed operability, maintainability and information into engineering.
People, processes, systems, materials, documents and assets.
Simulations, commissioning, punch list and gate validation.
Start-up, ramp-up, early-life failures and line transfer.
The scope adapts to project maturity, contracting model and the responsibilities of the owner, EPC and operating organization.
Readiness evidence must exist before start-up and remain useful through stabilization.
Workstreams, owners, dependencies, gates, schedule and acceptance criteria.
Taxonomy, asset register, master data, documents and SAP PM/CMMS requirements.
Plans, job plans, spares, materials, inspections and management routines.
Roles, procedures, competency matrix, training and simulations.
Verifiable dossier, punch list, start-up and ramp-up support, and early-life-failure management.
Asset structure, initial plans, spares, documentation and work systems must exist before start-up urgency turns them into operational debt.
An Operational Readiness Diagnostic identifies gaps by workstream, criticality, dependency and impact on the start-up date.